All subjects

Project-Based Learning Units That Stay Manageable

See the resources 101 ready-to-teach resources
Quick answer

Manageable projects have a narrow driving question, a defined product with a size limit, checkpoints where you see every group and a rubric given on day one. Units with a built-in project are a safe way to start.

Why projects go wrong

Projects fail for predictable reasons: the task is too open, the deadline is the only checkpoint and assessment is decided at the end. All three can be fixed in the planning.

Four things every project needs

  1. A driving question narrow enough to answer.
  2. A defined product with a size limit.
  3. Checkpoints at which you see every group’s progress.
  4. A rubric students receive on the first day.

Starting small

A unit that already contains a project with worksheets and slides is a safe first step. Students do the content lessons first and the project applies them, so nobody starts from a blank page.

Questions teachers ask

How long should a classroom project last?
One to three weeks is manageable for most classes.
How do I assess group projects fairly?
Use a rubric shared at the start and include an individual component such as a reflection.
Do the units include project materials?
Yes. Units in this collection include a project alongside lesson materials.

Instant digital download. Print, project or assign today.

Browse the full collection